5FJ-P 8/08Technical Assistance is available Monday - Friday, 8:00 a.m. - 5:00 p.m. (Central Time)1-877-723-7190 (Toll Free)5FJ-PFrameless Swing D
5FJ-P 8/08PARTS LISTTOOLS NEEDED1/8" Drill Bit3/16" Drill Bit(3/16" Masonry Bitfor Ceramic Tile)Scratch AwlMeasuring TapeHacksawPhill
5FJ-P 8/08OUTSIDE OF SHOWERHKMAGCHMAGNETICCATCH KITA993MAGNETIC DOOR STOPV678VINYL DOOR SEALH470 TRUSSHEAD SCREWHA75METALSLIDEA855SILLAA942JAMBV001V
5FJ-P 8/08Measure opening at threshold of shower and cut sill (A) tothat measurement. If necessary, file corner of sill to fitcontour of your unit.
5FJ-P 8/08Measure from wall to wall over the top of both jambs andcut header (C) to that measurement.Position header so that long leg is toward insi
5FJ-P 8/08Adjust alignment of door panel, magnetic door stop,double channel, and in-line panel so that magneticcatch aligns evenly and door closes w
5FJ-P 8/08HingeDoor Stop8A x 3/8 "Truss HeadScrewsKDASidePanelSecure sill by drilling, from outside shower, throughsill into magnetic door stop
5FJ-P 8/0812CaulkingOn opening side of door, caulk joint on sill where magneticdoor stop and sill meet. On opposite side, caulk wherehinge door sto
Comments to this Manuals